Communal breakdowns

This page is updated every two hours between the hours of 8am to 10pm with planned and unplanned outages on our estates. All times quoted are indicative and actual return to service times and dates may change.

Important safety notice – potential issue affecting your boiler

The manufacturer Ideal Heating, has identified a potential issue affecting a small proportion of their range of boilers. If an excessive volume of air becomes trapped inside the boiler in a fault condition, it could cause the boiler to overheat and fail. To fix this issue a heating engineer will need to visit your home to make a small modification to your boiler. The visit will be free of charge and take 30 to 60 minutes. To register for the upgrade, we need you to confirm your contact details at www.idealsupport.co.uk. 
You can continue to use your boiler. However, we advise you check that its pressure gauge is as close to 1.5bar as possible. 

If your boiler is at less than one bar and you are unable to repressurise it, please do one of the following: 

Call our call centre on 0800 952 4444 
Call Ideal Heating on 0808 175 9173 
Email customer@idealsupport.co.uk 

We're sorry that this issue has arisen and appreciate you may have concerns. If you have any questions, visit www.idealsupport.co.uk or get in touch using the contact details on this page. 

The communal heating system is changing to winter mode across the borough in phases on 16 and 17 October 2025. This is due to the outside temperatures dropping below 17°C in the day and below 10°C in the evening for 5 consecutive days.

If your issue is not listed, find out how to report a repair.

Page last updated: 01 April 2026 16:27

Current outages listing
Block name Outage description Date reported Estimated return to service Status
North Peckham Estate:
Quenington Court 1-32
Cronin Street 1-126
Quedgley Court 1-36
Westonbirt 1-30
Pentridge Street 1-67
East Surrey Grove 18-68
Rowan Court 1-45
Pear Court 1-17
Danube Court 1-30
Thames Court 1-53
Indus Court 1-8
Amstel Court 1-17
Oak Court 1-35
Blackthorne Court 1-31
Palm Court 1-33
Bridgewater Tower 1-34
George Williams House 1-28
Mary Ellery House 1-22
Ridgeway House 1-25
Wickway Court 1-118
Shannon Court 1-11
Planned shutdown of heating and hot water services 01/04/2026 14/04/2026 There will be an interruption to the heating and hot water services from 9am on 14/04/2026 for approximately 8 hours for essential maintenance work.
Crompton House 1-21 Lift 1146 out of service 01/04/2026 TBC Technician to attend and investigate
Vauban Estate 68-82 Planned shutdown of secondary water service 01/04/2026 15/04/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins on 14/04/2026 & 15/04/2026 from 9am for approximately 8 hours daily for essential maintenance works.
Hunter Court 1-17 Planned shutdown of secondary water service 01/04/2026 15/04/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins on 15/04/2026 from 9am for approximately 4 hours for essential maintenance works.
Perronet House, Princess Street 1-90(C); Tenants Clubroom 44(C)., SE1 6JS Loss of heating and hot water service 01/04/2026 01/04/2026 Contractors to attend and investigate

Returned to service 01/04/2026 - Please allow approximately 2 hours from 12pm for service to be fully operational.
Arnold Estate 66-80 Loss of power supply 01/04/2026 TBC UKPower Networks (UKPN) have isolated power to your block due to a high earth reading on their cable. UKPN are investigating the issue and aim to restore as soon as possible.
Mann Street 2
Westmoreland Road 54-72
Cherrill street 4-24
Harcourt Street 1-8
Bradenham Street 3-21
Albany Road 386–388
Harriet Hardy Court 1-54
Wallington Court 55-113
Amodio Court 1-7
Langley Court 1-67
Loss of hot water service 01/04/2026 TBC Contractor to attend and investigate

Update 01/04/2026 @4:00pm - Repairs to your heating/hot water are still on going and we are working hard on restoring your service as soon as possible.
Slade Walk 1-58 Loss of heating service 01/04/2026 TBC Contractor to attend and investigate
Lockwood Square 1-188 Planned shutdown of hot water service 31/03/2026 13/04/2026 There will be an interruption to the hot water service from 9am on 13/04/2026 for approximately 6 hours for essential maintenance work.
Mccoid Way 1-22
Collinson Walk 1-40
Scovell Crescent 1-47
Borough Square 1-15
Planned shutdown of heating and hot water services 31/03/2026 13/04/2026 There will be an interruption to the heating and hot water services from 9am on 13/04/2026 for approximately 7 hours for essential maintenance work.
Latimer 1-90 Planned shutdown of hot water service 31/03/2026 14/04/2026 There will be an interruption to the hot water service from 9am on 14/04/2026 for approximately 1 hour for essential maintenance work.
Albert Westcott 1-48 Lift 4004 out of service 31/03/2026 31/03/2026 Repairs required

Returned to service 31/03/2026
Wyndham Estate :
Aberfeldy House 1-155
Andrews Walk 1-31
Bethwin Road 97-111
Chalmers Walk 1-20
Copley Close 1-5
Dale Road 1-6
Glenfinlas Way 1-53
Grimsel Path 2-45
Hanworth House 1-140
Hillingdon Street 143-151
John Ruskin Street 110-124
Kirwyn Way 1-38
Laxley Close 9-56
Trevelyan House 1-63
Planned shutdown of heating and hot water service 31/03/2026 13/04/2026 There will be an interruption to the heating and hot water services from 9am on 13/04/2026 for approximately 7 hours for essential maintenance work.
Alscot Way 12-22 Loss of heating and hot water service 31/03/2026 31/03/2026 Contractor to attend and investigate

Update 31/03/2026 @4:00pm - Repairs to your heating/hot water are still on going and we are working hard on restoring your service as soon as possible.

Returned to service 31/03/2026 - Please allow approximately 2 hours from 5pm for service to be fully operational.
West Lake 1-130 Loss of secondary water service 31/03/2026 01/04/2026 Contractor to attend and investigate

Returned to service 01/04/2026 - Repairs to the cold water supply are now complete and service restored. Apologies for the inconvenience caused.
Churchyard Row 83-115 Lift 4144 Out of service 30/03/2026 TBC Contractors to attend and investigate
St Stephens House 1-20 Lift 4045 is out of service 30/03/2026 TBC Contractors to attend and investigate
Lockwood Square 3-188 Planned refurbishment of lift 5053 30/03/2026 05/06/2026 There will be an interruption to the lift services from 8am on 13/04/26 until 05/06/26 for refurbishment work
Purbrook Estate 81-106 Planned shutdown of secondary water service 30/03/2026 08/04/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins on 08/04/2026 from 9am for approximately 8 hours for essential maintenance works.
Marden Square 2-185 Planned refurbishment of lift 5058 30/03/2026 05/06/2026 There will be an interruption to the lift services from 8am on 13/04/26 until 05/06/26 for refurbishment work
Wesley Close 25 - 107 Planned shutdown of heating service 30/03/2026 10/04/2026 There will be an interruption to the heating service from 9am on 10/04/2026 for approximately 8 hours for essential maintenance work.
Bardell House 1-32 Lift 5110 out of service 30/03/2026 TBC Part required
Morton House, Otto Street 1-39 Loss of heating and hot water service 30/03/2026 30/03/2026 Contractor currently onsite to investigate

Returned to service 26/03/2026 - Please allow approximately 2 hours from 5pm for service to be fully operational.
Wickway Court 1-118 Loss of heating and hot water service 30/03/2026 30/03/2026 Contractor to attend and investigate

Returned to service 30/03/2026 - Please allow approximately 4 hours from 9:30pm for service to be fully operational.
Wendover 1-240 Lift 4029 out of service 30/03/2026 01/04/2026 Part required

Returned to service 01/04/2026
Shannon Court, Garnies Close 1-11 Loss of heating service 30/03/2026 TBC Contractor to attend and investigate

Update 01/04/2026 @4:00pm - Repairs to your heating/hot water are still on going and we are working hard on restoring your service as soon as possible.
36-62 Wentworth Crescent, London, SE15 5UG Loss of heating and hot water services 28/03/2026 TBC Contractors to attend and investigate
2-60 Bath Close, London, SE15 2JP Loss of heating and hot water service 28/03/2026 28/03/2026 Contractors to attend and investigate


Resolved on 28/03 @ 16:00
Brook Drive Flats 1-38(C) / 71-89(O) ., SE11 4TR Loss of heating and hot water services 28/03/2026 28/03/2026 Contractors to attend and investigate


Resolved on 28/03 @ 22:50
Raven House 1-14 Planned shutdown of secondary water service 27/03/2026 07/04/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins on 07/04/2026 from 9am for approximately 4 hours for essential maintenance works.
Ivy Church Lane 1-17 Loss of primary and secondary water services 27/03/2026 30/03/2026 Contractor to attend and investigate

Returned to service 30/03/2026
Kennington Park Road 167 A-E Emergency shutdown of secondary water services 27/03/2026 02/04/2026 Due to emergency works there will be interruption to the secondary water service affecting toilets, baths/showers and wash hand basins from 8am on 02/04/2026 for approximately 4 hours for essential maintenance works.
Priory Court 1-72
Priory Court TRA Hall
Planned shutdown of heating and hot water services 27/03/2026 09/04/2026 There will be an interruption to heating and hot water services from 9am on 09/04/2026 for approximately 8 hours for essential maintenance work.
Bath Close 85 - 101 Planned shutdown of secondary water service 27/03/2026 10/04/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins on 10/04/2026 from 9am for approximately 8 hours for essential maintenance works.
Budleigh House 1-24 Planned shutdown of secondary water service 26/03/2026 09/04/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins on 09/04/2026 from 9am for approximately 4 hours for essential maintenance works.
Thames Court, Daniel Gardens 34-53 Loss of heating and hot water services 26/03/2026 TBC Contractor to attend and investigate

Update 01/04/2026 @4:00pm - Repairs to your heating/hot water are still on going and we are working hard on restoring your service as soon as possible.
Kevan House 1-82 Planned shutdown of hot water service 25/03/2026 08/04/2026 There will be an interruption to the hot water services from 9am on 08/04/2026 for approximately 3 hours for essential maintenance work.
St Vincent House 1-72 Lift 1086 out of service 25/03/2026 TBC New drive unit required
Grosvenor Park 6 / Flats 1-30 Loss of heating and hot water services 25/03/2026 26/03/2026 Contractor to attend and investigate

Returned to service 26/03/2026 - Please allow approximately 2 hours from 10am for service to be fully operational.
John Kennedy House 1-96 Urgent shutdown of boosted cold water service 24/03/2026 31/03/2026 There will be an interruption to cold water services affecting the drinking water supply, the secondary water supply affecting toilets, baths/showers and wash hand basins and the hot water service to the block from 9am on the 31.03.2026 for a period of approximately 3 hours for urgent maintenance work.
Brydale House 1-96 Urgent shutdown of mains water service 23/03/2026 30/03/2026 There will be an interruption to the mains water service to the block affecting the drinking water supply from 9am on 30/03/2026 for approximately 6 hours for urgent maintenance work.
Daniels Road 84-144 Urgent shutdown of mains water service 23/03/2026 31/03/2026 There will be an interruption to the mains water service to the block affecting the drinking water supply from 9am on 31/03/2026 for approximately 6 hours for urgent maintenance work.
Atwood House 1-28
Barker House 1-24
Blackstone House 1-8
Beresford House 1-32
Bradlord House 1-24
Broderick House 1-24
Urgent shutdown of mains water service 23/03/2026 01/04/2026 There will be an interruption to the mains water service to the block from 9am on 01/04/2026 for approximately 6 hours for urgent maintenance work
Camberwell Grove 125-151
Walters House 1-14
Craston House 1-8
Springfield House 1-24
Edgecombe House 1-28
Harden House 1-39
Planned shutdown of heating and hot water services 19/03/2026 01/04/2026 There will be an interruption to heating and hot water services from 9am on 01/04/2026 for approximately 8 hours for essential maintenance work.
Larch House 1-45 Planned shutdown of secondary water services 19/03/2026 02/04/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins from 9am on 02/04/2026 for approximately 4 hours for essential maintenance work.
Consort Estate Planned shutdown of heating and hot water services 18/03/2026 01/04/2026 There will be an interruption to heating and hot water services from 9am on 01/04/2026 for approximately 8 hours for essential maintenance work.
Cronin Street 63-88
Cronin Street 39-62
East Surrey Grove 18-38
Rowan Court 26-45
Pear Court 1-18
Planned shutdown of hot water and mains water services 18/03/2026 01/04/2026 There will be an interruption to the mains water service affecting the drinking water supply and the hot water service from 9am on 01/04/2026 for approximately 5 hours for essential maintenance work.
Vauban Estate 26-53 Planned shutdown of secondary water service 17/03/2026 31/03/2026 There will be an interruption to the secondary water service affecting toilets, baths/showers and wash hand basins from 8am on 31/03/2026 for approximately 4 hours for essential maintenance work.
Vauban Estate 26-53 Planned shutdown of secondary water services 17/03/2026 31/03/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins from 8am on 31/03/2026 for approximately 4 hours for essential maintenance work.
Ryegates 1-27 Planned shutdown of secondary water services 17/03/2026 31/03/2026 There will be an interruption to secondary water services affecting toilets, baths/showers and wash hand basins from 9am on 31/03/2026 for approximately 4 hours for essential maintenance work.
Purbrook Estate 107-130 Planned shutdown of secondary water service 13/03/2026 30/03/2026 There will be interruption to the secondary water service affecting cylinders, toilets, baths/showers and wash hand basins from 9am on 24/03/2026 and 30/03/2026 for a period of approximately 8 hours for essential maintenance works
Brownlow House 1-20 Planned refurbishment of lift 5113 02/03/2026 01/05/2026 There will be an interruption to the lift services from 8am on 16/03/26 until 01/05/26 for refurbishment work
Day House 85-108 Planned refurbishment of lift 4054 16/02/2026 17/04/2026 There will be an interruption to the lift services from 8am on 02/03/26 until 17/04/26 for refurbishment work
Pedworth SHU 1-34 Lift 5200 out of service 14/11/2025 TBC Part required

Update 02/12/25: New door motor required
Keyworth Hostel Lift 2000 out of service 25/09/2025 TBC Technician to attend and investigate

Update 13/02/2026: Technician returning to site to carry out further works needed.

Page last updated: 01 April 2026 16:27